1. Frequently Asked Questions
  2. Installation and Commissioning

Do you need any information before arriving on-site?

Address and site details

Before our visit, please send us an email containing drawings, previous reports, full address and access codes or key safe location to gain entry.

Access to site

Please ensure that all rooms that hold equipment or where commissioning will take place are accessible and that someone onsite has the keys needed to unlock them if they are not.

System schematics

Please ensure that system schematics are relevant, correct and up to date as any mistakes can lead to significant delays.